Submitted by Bart Tucker
Director, Fuller Center Disaster ReBuilders
Some of you are aware that we've been dealing with a serious technical issue for the four houses underway--the pilings at two of the four homes were cut short. One house was two feet below ABFE (advisory base flood elevation) and the second was one foot short. The surveyor revealed this when the second house was very far along in trim-out.